Filtered by vendor Critical Path
Subscriptions
Filtered by product Livecontent Directory
Subscriptions
Total
2 CVE
CVE | Vendors | Products | Updated | CVSS v3.1 |
---|---|---|---|---|
CVE-2001-1315 | 1 Critical Path | 2 Injoin Directory Server, Livecontent Directory | 2024-11-20 | N/A |
Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code via malformed BER encodings, as demonstrated by the PROTOS LDAPv3 test suite. | ||||
CVE-2001-1314 | 1 Critical Path | 2 Injoin Directory Server, Livecontent Directory | 2024-11-20 | N/A |
Buffer overflows in Critical Path (1) InJoin Directory Server or (2) LiveContent Directory allow remote attackers to cause a denial of service (crash) and possibly execute arbitrary code, as demonstrated by the PROTOS LDAPv3 test suite. |
Page 1 of 1.